More Mission Clay Day

The kilns at Mission Clay. A firing takes 3 weeks.

kilns IMG_5195_640x480

More images showing the progression of work on the clay pipe…IMG_5170_640x480 IMG_5173_640x480IMG_5171_640x480 IMG_5174_640x480 IMG_5180_640x480 IMG_5181_640x480 IMG_5216_640x480

The pipe with a thin coat of clear glaze, ready to dry and be fired.

2 thoughts on “More Mission Clay Day

Leave a reply to cindyschnackel Cancel reply